ECOBUS 300

ECOBUS 300
View as List Grid

1 Item

per page
Set Descending Direction
  1. ECOBUS 300
    ECOBUS 300
    Cod. 001858EL
    MAIN OPERATIVE PHASES - The Tandem Ball Valve allows to have the operating levers on the same axis, thus making easier the series of operations to control the liquid through the different passages. 1) Filling of the Sprayer suctioning water from the outside (channel, well and so on). 2) During the Sprayer filling it is possible to introduce the mixed chemical products. 3) Mixing of the chemical products in a closed circuit/recycle. 4) Washing of containers for chemical products and washing of the structure. 5) Washing of the Sprayer and collection of the rinsing residues. 6) Quick transfer of the liquids.
    SUPPLY
    ELECTRIC
    CAPACITY
    300 L
    COLOR
    white
    VERSION
    4R
View as List Grid

1 Item

per page
Set Descending Direction